Lesaffre
0°C refrigerated warehouse, 1,650 pallets across 5 levels, 100 pallets/h throughput, laser-guided shuttle system. 900 KW refrigeration plant, SAP and WMS Runner integration.

The challenge
Lesaffre, a global yeast production leader with over 55 manufacturing sites, required a 0°C automated refrigerated warehouse as a turnkey contract, entrusting Trascar with all disciplines: automation, civil construction and industrial systems, with full operational switchover in a single weekend.
The solution
Trascar designed and built as general contractor a 2,400 m² refrigerated warehouse with 1,650 pallet positions across 5 levels, laser-guided shuttle, proprietary WMS with SAP interface and 900 kW refrigeration plant. The system went from zero to full production in a single weekend.